As of 2020, APR uses 100% renewable energy to power our VSF production, whereas we relied on purchased coal for 10% of our energy needs in 2019. APR purchases our energy from PT Riau Prima Energi(RPE), our sister company with multi-fuel and chemical recovery boilers that can supply more than 100% of our energy needs. We calculate our total energy needs using a mass balance approach based on the energy required to produce one tonne of VSF.
In 2021, we will be installing solar panels at our integrated mill complex that will supply 1% of our energy needs when fully operational.